ZFU LABELS · BUYER WORKSHEET · VERSION 1 / 29 OCTOBER 2026

Label Approval Handoff Worksheet

Keep artwork approval, package-use evidence and delivery-format acceptance attached to the same job revision. A decision in one scope does not approve the other two. Start blank; enter the actual evidence, responsible person and limits of each decision.

Download blank CSVRead the buying guide

Fields stay in this page while it is open. This worksheet does not save or send entries. Print completed fields before closing or reloading; add sheets if a field is too small. The CSV is a blank template, not an export of these entries.

1 · Artwork & appearance

Evidence: identified artwork file, cut outline and copy approval; any agreed physical colour reference has its own ID and scope.

Boundary: a PDF can establish a content/layout decision. It does not establish adhesion, physical colour or machine performance.

2 · Package & application

Evidence: identified sample/construction, actual package surface, application conditions, handling sequence and agreed acceptance criteria.

Boundary: record what was observed and what remains untested. A different package, surface or use route needs an impact review.

3 · Delivery format & line

Evidence: station-specific drawing, core and roll limits, web/gap requirements, unwind orientation and the agreed SKU/roll allocation.

Boundary: a loose-label photo does not establish supplied roll compatibility. Use the line owner's actual specification and procedures.

Reconcile before the authorised release

Missing evidence or a conflicting revision? Hold the affected scope and assign its unresolved question. Do not infer approval from a blank field.

  1. Use explicit status words: OPEN, UNDER REVIEW, HOLD or APPROVED FOR THE STATED SCOPE. Include the decision date and named responsible person.
  2. Check that all relevant evidence represents the intended job. The authorised release owner decides whether unresolved items prevent release under the agreed order and site procedures.
  3. After a change, record which evidence remains representative and which scope reopens. A routine copy edit and a new container surface do not create the same review task.